Flint Hill Elementary, Phase 2 & 3 Additions

Prime Contractor, lump sum bids for completing the project in its entirety, are to be submitted directly to the Owner on bid forms provided in the Project Manual. In general, the project involves additions to be constructioned in two phases, identified as Phase 2 and Phase 3, to occur in sequence so that when the first phase is completed and modular classrooms are moved then the next phase will commence. Phase 2 Addition is approximately 24,100 sf and consists of approximately 17 classrooms of various sizes and a small gymnasium/storm shelter area. Phase 3 Addition is approximately 14,170 sf and consists of approximately 11 classrooms of various sizes.

Status

Bidding Closed

Prebid Date7/17/18 10:00 am

Bid Date8/2/18 3:00 pm

Company & Contacts

Fort Zumwalt School District

Lisa Koester   lkoester@fz.k12.mo.us

Location

587 Mexico Road, Wentzville, MO 63385

Pre-bid location: Hope High School, 307 West Pitman, O’Fallon, MO 63366

Alternate bids:

Alternate #1: State the amount to be ADDED to the Base Bid to replace existing waterles surinals in the existing boys restrooms with new urinals as indicated on the Drawings and as specified

Alternate #2: State the amount to be ADDED to the Base Bid to provide Faced Rigid Polyisocyanurate Board Roof Insulation in lieu of liner system faced and unfaced blanket roof insulation, as specified in Section 133419 “Metal Building System”