RFQ 2020 Parks Project Engineering Design Services

Status

Accepting Bids

Bid Date2/25/20 2:00 pm

Company & Contacts

ST LOUIS COUNTY

Tobi Moriarty, tmoriarty@stlouisco.com  

Location

St. Louis County Parks

The project involves engineering support to Department of Parks and Recreation for the Department’s miscellaneous 2020 projects that are not large enough to stand on their own. This project also includes engineering support for unforeseen design needs that may develop during the 2020 year. Some projects will require bid documents while others will be installed by Parks Department’s internal forces.

The list of 2020 Parks Projects that are anticipated to require design services as part of this project include, but are not limited to the following:

• Structural evaluation, recommendations, and follow-up design services to replace or reconstruct fire struck restroom in Lemay Park

• Reconstruction of maintenance compound asphalt area, including retaining walls and fencing at St. Vincent Park

• Survey of spillway from Creve Coeur Lake

• Survey and secure necessary permits to fill ravine behind rowing club in Creve Coeur Park

• Design entrance road and configure parking lot for North County Recreation Complex

• Survey and design of pedestrian trai I near Music School in Faust Park.

• Develop accessible parking space designs for select shelters in various parks

• Design of new parking lot and entrance off Trampe Avenue at Spanish Lake Park

• Design of new entrance monument off Spanish Pond Road at Spanish Lake Park

• Site development design for the installation of prefabricated vault style outhouses in various park locations

• Design of boardwalks for in-house construction in flood-prone trails and through wetlands

• Design of replacement salt storage shelter at Suson Park

• Ground stabilization or structural design for tennis courts at Kennedy Recreation Complex