University Dr. and Grobman Rd. Paving (Phase 2)

Paving of Grobman Dr. from Clark Hall Dr. to University Dr., University Dr. from Grobman to Natural Bridge Rd., and Clark Hall Dr. from Grobman to Lot C

Status

Pending

Company & Contacts

UMSL

Brady Jordan, bsjordan@hornershifrin.com   (314) 335-8661

Location

University of Missouri - St. Louis

The Pre-Bid for this project has been postponed. The delivery of bids and public bid opening for this project, originally scheduled for April 7, 2020, is postponed. A future date and time for both the Pre-Bid and the Bid Opening will be announced via addendum.

UMSL Design Project Manager: Tyler Middendorf, tjmmgh@umsl.edu, (314) 516-6340