Boiler System - Mary Ryder Home

The project consists of transitioning the remaining portion of the Geothermal Loop to a Fluid Cooler/Boiler System for the Home. The Scope of Work includes, but is not limited to, adding a 2nd Fluid Cooler to the existing and installing a Boiler in the Mechanical Room per engineered specifications.

Status

Bidding Closed

Prebid Date12/17/21 9:00am

Bid Date1/12/22 12:00pm

Company & Contacts

SLDC

Julie McDowell  

Location

4361 Olive Street, St. Louis, MO 63108

Full details at providentstl.org/bids-mrh/