Midland Boulevard (West) Resurfacing (AR-1472)

St. Louis County Project No. AR-1472 consists of the removal and replacement of deteriorated and/or damaged pavement and shoulders, curb, curb & gutter,driveway approaches,curb ramps,sidewalk, signal detector loops pavement surfacing and texturing, and Superpave asphaltic concrete overlay

Status

Bidding Closed

Bid Date6/15/22 2:00pm

Company & Contacts

St. Louis County

Shandrika Combs,scombs@stlouiscountymo.gov , Brian Gettinger,Bgettinger@stlcountymo.gov  

Location

St. Louis County

St. Louis County Project No. AR-1472 consists of the removal and replacement of deteriorated and/or damaged pavement and shoulders, curb, curb &
gutter, driveway approaches, curb ramps, sidewalk, signal detector loops,
pavement surfacing and texturing, and Superpave asphaltic concrete overlay
along approximately 2.77 miles of roadway within St. Louis County and
other incidental items necessary to
complete the above in a workmanlike manner.