Public Jobs

Bids due in 26 days
11/16/18 2:00 pm
11789-015.1 Caulks Creek Forcemain Rehabilitation
Metropolitan St Louis Sewer District
inside the city(ies) of Chesterfield and Maryland Heights in the State of Missouri.
rehabilitation of 26,823 lineal feet sanitary forcemain varying in size from 20" to 30" in diameter, and appurtenances.
Bids due in 44 days
12/4/18 2:00 pm
13082-015.1 Lower Meramec WWTF Fitting Replacement (IR
Metropolitan St Louis Sewer District
Bids due in 23 days
11/13/18 2:00 pm
BJWC Medical Office Building – MOB4
BJC Planning, Design, and Construction
12634 Olive Boulevard in Creve Coeur, Missouri 63141
Bids due in 26 days
11/16/18 3:00 pm
12253-015.1 Valcour and Burlington RR Sanitary Relief and I/I Reduction (Valcour Dr and Watson Rd)
Metropolitan St Louis Sewer District
north of Rock Hill Road and west of Elm Avenue, in the City of Cities of Marlborough and Webster Groves and unincorporated St. Louis County
construction of approximately 354 lineal feet of 12-inch diameter storm sewer and appurtenances, and the removal of inflow sources from 33 private properties.
Bids due in 23 days
11/13/18 2:00 pm
12126-015.1 Coldwater Upstream Pump Station (P-180) Storage
Metropolitan St Louis Sewer District
south of Highway 67 and west of Lewis and Clark Boulevard, in the City of unincorporated St. Louis County, Missouri.
Construction of 994 lineal feet of 66-inch diameter sanitary storage pipe, 150 lineal feet of 18-inch diameter sanitary sewer, and appurtenances.
BJC Memorial Hospital East MOB Phase II - Shiloh, IL BP #4 - Shell, Core & Interiors
IMPACT Strategies
Bids due in 25 days
11/15/18 2:00 pm
12363-015.1 North Webster CC, Pocahontas, South Brentwood I/I Reduction (S Brentwood Blvd and Manche
Metropolitan St Louis Sewer District
south of Litzsinger Road and west of Bampart Ave, in the City of cities of Brentwood, Rock Hill and Webster Groves, Missouri.
Removal of inflow sources from 50 private properties and appurtenances.
Bids due in 19 days
11/9/18 2:00 pm
12885 -015.1 Spring Water 2932 Storm Main Replacement (IR)
Metropolitan St Louis Sewer District
south of Telegraph Road and east of Becker Road, in the City of unincorporated St. Louis County, Missouri.
Construction of approximately 18 lineal feet of 18" diameter storm sewer point repair, and appurtenances.
Bids due in 24 days
11/14/18 2:00 pm
12780-015.1 Ville Angela Ln 1550 Storm Sewer (IR)
Metropolitan St Louis Sewer District
north of Interstate 270 and west of James S. McDonnell Boulevard, in the City of Hazelwood, Missouri.
Construction of approximately 35 lineal feet of 36” pipe sewers and appurtenances.
Bids due in 17 days
11/7/18 2:00 pm
12711-015.1 Gaslight Square Fence Construction (#345 Whittier & #4205 Maryland Ave)
Metropolitan St Louis Sewer District
east of Boyle Avenue and north of Lindell Boulevard, in the City of St. Louis, Missouri.
Construction of approximately 388 lineal feet of fence.