Helix Center Renovations
The Project generally consists of the west lobby renovation; Growth Farm renovations and HVAC improvements; relocating specific electrical equipment to a new electrical room; HVAC additions for the new electrical room; limited first floor finishes; two (2) dry labs and five (5) labs with sinks on the second floor; new boiler pipe insulation; repairs to RTU1; removal and replacement of RTU2; a new loading/unloading area; vestibule door hardware improvements; and exterior improvements associated with the Growth Farm HVAC equipment
Architectural
(click to expand/collapse)

Name | Size | ||
HELIXC~1 | 13.7 MB |
Electrical
(click to expand/collapse)

Name | Size | ||
HELIXC~2 | 2.8 MB |
Piping
(click to expand/collapse)

Name | Size | ||
HELIX CENTER - PIPING - 100% CD | 1.3 MB |
Plumbing
(click to expand/collapse)

Name | Size | ||
HELIXC~4 | 1.4 MB |
Technology
(click to expand/collapse)

Name | Size | ||
HEB624~1 | 1.0 MB |
Ventilation
(click to expand/collapse)

Name | Size | ||
HE5820~1 | 2.3 MB |