8791- St. Louis Air Cargo Pavement Reconstruction at St. Louis Lambert International Airport
The project consists of the removal and replacement of the existing pavement and subbase within the limits shown on the plans for Air Cargo Pavement Replacement, resurfacing three existing asphalt parking lots, installation of perimeter fencing and security gates. The new concrete pavement shall be constructed with the same width and profile grade as the existing roadway pavement. The existing storm sewer inlet grates within the pavement replacement section shall be replaced. Electrical work will consist of replacing two lights and providing power and access control to the security gates.
Status
Accepting Bids
Prebid Date | 8/5/25 10:00am |
Bid Date | 8/26/25 1:45pm |
Company & Contacts
SLDC
City of St. Louis Board of Public Service, Helen Bryanth
Location
St. Louis, Missouri
An optional pre-bid conference for all contractors bidding on this project will be held Tuesday August 5,2025 in the Ozark Conference Room at 10:00 am in the Airport Office Building (AOB) located at11495 Navaid Road – 4th Floor, Bridgeton, MO 63044. All bidders are strongly encouraged to attend the pre-bid meeting.