8791- St. Louis Air Cargo Pavement Reconstruction at St. Louis Lambert International Airport

The project consists of the removal and replacement of the existing pavement and subbase within the limits shown on the plans for Air Cargo Pavement Replacement, resurfacing three existing asphalt parking lots, installation of perimeter fencing and security gates. The new concrete pavement shall be constructed with the same width and profile grade as the existing roadway pavement. The existing storm sewer inlet grates within the pavement replacement section shall be replaced. Electrical work will consist of replacing two lights and providing power and access control to the security gates.
Bid Documents (click to expand/collapse)
Specs (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
8791 Specifications 7.9 MB